Coiled Tubing Exam

Enter your ACCESS PASSWORD

Fill in your information

1 / 30

You plan to run a production logging tool (PLT) on coiled tubing in a sand producing well.

Which potential situation should you prepare for?

2 / 30

During a coiled tubing programme, you plan to circulate solids out of the well. What must you do before starting the operation?

3 / 30

The location alarm sounded when coiled tubing was deep in the well. The operation suspended. The crew went to the muster point.

It is now safe to continue the coiled tubing intervention. What should you do next?

4 / 30

What is the main function of deployment bars when using a coiled tubing pressurised deployment system to run long BHAs into live wells?

5 / 30

When running into the well, the coiled tubing breaks as it passes through the measuring head in front of the reel.
The operator stops running the coiled tubing, shuts down the pumps, and closes the slip and pipe ram BOPs.

After a short time, there is flow from the coiled tubing in the well. What action is required next?

6 / 30

You are planning a coiled tubing operation in a well with large diameter completion tubing.

What is an important thing to consider when choosing the size of coiled tubing for these well conditions?

7 / 30

During a coiled tubing clean out operation, nitrogen (N2) and fluid returns are directed through a three-phase separator. The separator cannot cope with the liquid returns, and the flow control valves close. How would you make the well safe?

8 / 30

Coiled tubing is deep in a gas well when there is a serious leak at the reel and the coiled tubing is full of scale treatment fluid.
You shut down the fluid pump and close the quad BOP slip rams and pipe rams. Flow from the leak stops.

Why has the leak stopped?

9 / 30

There is a pinhole leak in the coiled tubing at surface. What keeps the check valves closed?

10 / 30

What should you close if the rotating joint on the coiled tubing reel is  leaking?

11 / 30

What is the purpose of a stripper in a coiled tubing PCE rig up?

12 / 30

Trapped air within the coiled tubing PCE is affecting the results of the pressure  test.

What should you do?

13 / 30

The well is live, and the coiled tubing is filled with fresh water.

What barriers should be in place to allow the repair of a rotating joint when coiled tubing is in the  well?

14 / 30

Figure CT0-0002 shows coiled tubing PCE rigged up on a Xmas  Tree.

Figure CT0-0002

You plan to change the upper stripper element of a dual stripper. You will use the pipe rams and the lower stripper element as barrier elements.

How can you tell if the pipe rams are leaking during an inflow test?

15 / 30

You are using coiled tubing to run a long BHA with a large OD into a well (Figure CT0-0006).

Figure CT0-0006

The stripper starts to leak when the BHA is across the Xmas Tree and BOPs.

What should you use to safely shut the well?

16 / 30

In a coiled tubing nitrogen-lift operation, where should the surface choke be  positioned?

17 / 30

While running in hole, the coiled tubing has accidentally been run into debris and the down hole  check valves are no longer holding pressure. Attempts to clear the debris by pumping through the  coiled tubing have been unsuccessful. What should you do next?

18 / 30

In a quad BOP, why are coiled tubing shear rams placed above the pipe and slip rams?

19 / 30

A well has been circulated with nitrogen (N2). In which situation would the coiled tubing BHA check  valves close?

20 / 30

Which BHA component prevents reverse circulation into the coiled tubing?

21 / 30

When pulling coiled tubing out of the well, you see that the coiled tubing is slipping at the injector  head.

Why has this happened?

22 / 30

Due to height limitations, the coiled tubing PCE rig up must be as short as possible.

How could you reduce the height of the PCE?

23 / 30

Figure CT0-0003 shows coiled tubing PCE rigged up on a Xmas Tree.

Figure CT0-0003

The coiled tubing bottomhole assembly (BHA) is in the riser when the stripper rubbers begin to  leak. How do you close in the well quickly and safely?

24 / 30

What is an advantage of using a combi coiled tubing BOP?

25 / 30

When pumping water through the coiled tubing, the fluid pump fails.

The pressure is bled off from the coiled tubing while the pump is being repaired.  What will be the first sign that the coiled tubing has collapsed?

26 / 30

The injector head fails during a coiled tubing acid scale removal operation. The BHA is at the  tubing retrievable surface controlled subsurface safety valve (TRSCSSSV) and cannot be  moved.

The coiled tubing is full of acid.

What should you do to maintain well integrity?

27 / 30

In a coiled tubing nitrogen (N2) lift operation, well fluids are flowing through the flow wing  into a  clean up package.

How should you shut in the well?

28 / 30

During a coiled tubing intervention in a dry gas well, the coiled tubing stripper rubbers need  to be  replaced frequently.

What could be the reason for this?

29 / 30

When using coiled tubing to pump acid at the perforations, there is a sudden  pressure increase  and a surface relief valve opens.

What should you do?

30 / 30

You plan to run coiled tubing into a well to mill scale.

Why is it important to consider coiled tubing diameter?