A kick is circulated out at 40 spm on surface BOP stack. Drillpipe pressure is 650 psi and the casing pressure is 1050 psi. The pumps are slowed to 30 spm while maintaining 1050 psi on the casing gauge.
How will this affect bottomhole pressure (BHP)? Exclude any equivalent circulating density (ECO) effects.
2 / 64
A driller prepares to pull out of the hole and lines up to the slug pit. The driller then pumps a 20 bbl heavy slug, followed by 10 bbl of drilling fluid from the active pit.
How far will the fluid level in the string dro p when the well has equalised?
3 / 64
Using the trip sheet below, what action should the supervisor take?
Note: The pipe will be pulled dry.
4 / 64
While displacing the well with kill fluid during the second circulation of the driller's method, when will the final circulating pressure (FCP) be reached?
5 / 64
How is lost circulation detected during a well control operation? Choose three answers.
6 / 64
Shortly after starting the first circulation of the driller's method, the drillpipe becomes plugged and you cannot circulate or read the drillpipe pressure. You have indications that the gas kick is migrating.
Which well control procedure should you apply?
7 / 64
A vertical well is shut in on a surface BOP installation. During the second circulation of the driller's method, when should the surface casing pressure first decrease?
8 / 64
While displacing the well with kill fluid using the wait and weight method, when will the final circulating pressure (FCP) be reached?
9 / 64
While killing a well, the drillstring is displaced to kill mud at a constant pump rate. There is a sudden loss in standpipe pressure, but no change in the casing pressure.
If the choke was closed to compensate for the reduction in pressure, how would this effect bottomhole pressure (BHP)?
10 / 64
A cement bond log has identified a poor cement job between the production casing string and the intermediate casing string. Pressure has built up in the annulus, between these casing strings. What is the long-term risk to well control?
11 / 64
What is one essential requirement of a management of change (MOC) procedure?
12 / 64
The drilling programme requires that the casing shoe is drilled out and a leak-off test (LOT) is performed 12 ft below the shoe depth. However, premixed mud is added to the active system and the fluid density in the suction tank is varying by 0.5 ppg.
In this situation, which action is required to give an accurate LOT result?
13 / 64
Which parameter would affect the leak-off test (LOT) pressure?
14 / 64
What would the shut-in drillpipe pressure (SIDPP) read if 10 bbl of gas 0.1 psi/ft is swabbed into the horizontal section of an 8-1/2 in well?
15 / 64
What is one advantage of the wait and weight method compared to the driller's method in vertical wells?
16 / 64
Before pulling out of hole, the drilling fluid density is increased by 0.5 ppg trip margin.
With this trip margin, calculate the increase in bottomhole pressure (BHP).
17 / 64
Calculate the rate of gas migration, in feet per hour, from the data below.
Shut-in drillpipe pressure increased by 50 psi in 15 minutes. Fluid density is 10.5 ppg.
18 / 64
What should you do if an annular BOP fails its pressure test?
19 / 64
What is the maximum allowable annulus surface pressure (MAASP)?
20 / 64
In addition to the handling capacity of the mud gas separator (MGS) and the volume capacity of the choke, what other factor do you need to consider when selecting the pump rate for killing the well?
21 / 64
The pit level increases when the pumps are off, but the pit level stays constant when the pumps are running. What could be the problem?
22 / 64
What is the reduction in bottomhole pressure (BHP) if the drilling fluid level dropped by 800 ft with a density of 10.5 ppg?
23 / 64
During a well control operation, you see casing pressure rapidly increasing.
You tell the driller to shut down the pump to prevent over-pressuring the openhole.
What could have caused the rapid increase in casing pressure?
24 / 64
On a trip out of hole, the hole was filled correctly while pulling drillpipe. The hole fill pump was stopped and the complete BHA was pulled dry.
What is the expected decrease in bottomhole pressure (BHP)?
25 / 64
At what stage of a kill operation can choke pressure readings exceed MAASP without breaking down the formation at the shoe?
26 / 64
The driller fails to fill the hole when pulling out of the well. The drilling fluid level drops 580 ft causing the well to flow.
What is the bottomhole pressure (BHP) when the well starts to flow?
27 / 64
The measured gas percentage in the drilling fluid increases from 8% to 15% over one day. What should you instruct the driller to do?
28 / 64
In which situation can hydrates form?
29 / 64
During a well kill operation, using the driller's method, the casing pressure gauge reading suddenly increases by 150 psi.
After a short time, the operator sees a 150 psi pressure increase on the drillpipe pressure gauge.
What is the correct action to take?
30 / 64
While drilling, the derrickman asks the driller to reduce the pump rate so that the shakers can handle an increase in cuttings in the mud returns.
What should the driller do?
31 / 64
A vertical well on a surface BOP installation is killed using the wait and weight method. Initially, a quantity of original drilling fluid is pumped down the well instead of kill fluid. The quantity pumped is equivalent to a volume of 1000 ft of drillpipe.
What action is required?
32 / 64
Calculate the maximum allowable mud weight using the information below:
33 / 64
There was a delay in shutting in the well and a large influx was taken. How would this affect surface shut-in pressures?
34 / 64
Drilling continues after the leak-off test, and later there is a kick.
35 / 64
A well is drilled to a depth of 8200 ft TVD and the current density of the drilling fluid is 12.5 ppg.
What will the pressure be at 4920 ft TVD if 580 psi pressure is applied from surface with the BOP closed?
36 / 64
You are working on a rig that has a large surface line volume (from the mud pumps to the drill floor).
The wait and weight method will be used. The pump stroke counter was not reset to zero when the kill fluid reached the drill floor.
How will this affect the bottomhole pressure when pumping kill fluid to the bit, in line with the step down chart schedule?
37 / 64
After pulling ten stands out of the hole, the fluid it takes to fill the hole from the tank is less than calculated on the trip sheet.
38 / 64
When drilling a horizontal section of a well, there is a gas kick and the well shut in.
If the influx is in the horizontal section, what shut-in drillpipe pressure (SIDPP) and shut-in casing pressure (SICP) values would you expect to see on the pressure gauges?
39 / 64
An influx is shut in on a surface BOP installation, and the initial stabilised shut-in pressures are:
After the first circulation of the driller's method is complete, the well is shut in and the pressures stabilise. They then read:
What could be the next action?
40 / 64
Which critical pressure is calculated using the results of the leak-off test (LOT)?
41 / 64
During well kill operations, what will happen when bringing the pumps up to kill speed if the casing pressure is allowed to increase above shut-in casing pressure (SICP)?
42 / 64
The driller shuts in the well on a kick. The drillpipe pressure is zero because there is a float (non-return) valve in the drillstring.
What action should be taken to establish the shut-in drillpipe pressure (SIDPP)?
43 / 64
A well is shut in after a kick and will be killed using the wait and weight method.
What is the final circulating pressure (FCP) at 30 SPM?
44 / 64
Calculate the volume of drilling fluid required to fill the hole per stand when pulled 'wet', drilling fluid returns to the well.
45 / 64
Please use the blank Surface kill sheets and well data to answer the following 9 questions
Level 3 & 4 Surface Kill Sheet Section - Group 1
The well has been shut in after a kick.
The well will be killed using the Driller's Method at 30 spm
Q45: How many strokes are required to pump kill mud from surface to bit?
46 / 64
How many strokes are required to pump from the bit to casing shoe?
47 / 64
How many strokes are required to pump from the bit to surface?
48 / 64
What is the kill mud density?
49 / 64
What is the initial circulating pressure?
50 / 64
What is the final circulating pressure?
51 / 64
What is the MAASP at the time the well was shut in?
52 / 64
What is MAASP after circulation of the kill mud?
53 / 64
What is the time for one complete circulation?
54 / 64
Q54: The well will be killed using the wait and weight method at 30 SPM. Ignore the surface line volume.
After 50 strokes are circulated, the remote choke panel shows the following readings
What action should be taken?
55 / 64
After 240 strokes are circulated, the remote choke panel shows the following readings
56 / 64
After 420 strokes are circulated, the remote choke panel shows the following readings
57 / 64
After 900 strokes are circulated, the remote choke panel shows the following readings
58 / 64
After reaching final circulating pressure (FCP) after 1500 strokes circulated, the well is shut in to complete a pressure check. The remote choke panel then shows the following readings:
After confirming the pressure check is acceptable, the kill procedure is continued.
59 / 64
After 3050 strokes are circulated, the remote choke panel shows that the casing pressures is decreasing. A short time later, the drillpipe pressure also decreases.
60 / 64
After identifying the problem (from the previous question), what is the first action to take?
61 / 64
Once the problem (from the previous question) is resolved, the remote choke panel shows the following readings:
62 / 64
After 8000 strokes are circulated, the remote choke panel shows the following readings:
63 / 64
After 9000 strokes are circulated, the remote choke panel shows the following pressures:
64 / 64
After 12200 strokes are circulated, the remote choke panel shows the following readings:
The choke is now fully open, and the casing pressure gauge reads 0 psi.