With a work string in the hole a leak develops in the upper stripping 8
What would be the first action to take to enable a leak to be repaired?
2 / 30
Which of the following most affect the position (depth) of the balance point? Choose three answers.
3 / 30
Which of the following statements is true if a bleed-off line has a built-in choke?
4 / 30
The stripping annular BOP begins to leak as it is used to pull the pipe out of a live well. What action is required to pull the rest of the pipe out of the hole, if no replacements are available?
5 / 30
If the stripping rams are closed, can pipe ram inner seals be changed out with the pipe in the hole?
6 / 30
What is the main disadvantage of forward circulating when carrying out a sand clean-out using a snubbing work string?
7 / 30
When installing flanges and adaptors of different pressure ratings and material specifications, which component will determine the maximum test pressure of the rig up?
8 / 30
When stripping ram to ram on a high pressure gas well, the operator fails to stop the pipe at the correct space out. The pipe tool joint is forced into the upper stripping ram. What is the correct action to take?
9 / 30
Two back pressure valves (BPV) are installed as part of the bottomhole assembly (BHA) during snubbing operations. How can a leak in the lower BPV be identified?
10 / 30
What can you do to achieve a stable pressure test when testing a large volume riser and snubbing BOP stack?
11 / 30
Is it normal practice to have to change out the stripping ram inner seals during an intervention job?
12 / 30
During stripping out of the hole in "pipe light", one of the travelling snubber slips malfunctions. What action is required to make the operation safe?
13 / 30
You are stripping a work string through the annular BOP when there is a leak in the annular BOP. The work string is "pipe light". What action is required?
14 / 30
Which of the following BOPs are a shearing device?
15 / 30
What are the operational requirements for a non-shearable component in the snubbing string?
16 / 30
In a risk assessment for a snubbing operation, there is an option to kill the well by bullheading.
What must the crew check before they start the intervention operation?
17 / 30
You are snubbing a flush-joint workstring into a gas well.
The shut-in tubing head pressure prevents the use of the stripper bowl. What surface equipment contains well pressure during the operation?
18 / 30
Figure SN0-0002 shows a snubbing unit rigged up on a Xmas Tree.
Figure SN0-0002
Perforating guns will be snubbed into a live well.
What will limit the gun length?
19 / 30
At which stage of an operation are the travelling heavy slips used?
20 / 30
While snubbing a tapered workstring into the well, the balance point has just been passed.
You now need to change to running a larger outside diameter (OD) workstring.
How could this affect the operation?
21 / 30
During a snubbing operation, flow is coming from the workstring.
The operator closes the upper pipe rams and installs a stab-in valve on top of the workstring , but reports that the upper pipe rams are leaking.
What action is required?
22 / 30
You are planning to snub a flush-joint workstring into a high pressure well. What would be good practice to add to the surface rig up?
23 / 30
You are running a workstring with external collars into the well using stripping rams as the primary barrier.
One of the stripping rams is leaking and is badly worn.
What should you do?
24 / 30
While snubbing a workstring into a well, you notice the tubing make-up equipment is leaving marks below the connections. These marks will damage the stripper sealing element.
How can you avoid this without affecting the integrity of the workstring?
25 / 30
The crew are preparing to run a snubbing BHA with a non-shearable component.
What must they do to maintain well control while the non-shearable component passes through the BOP stack?
26 / 30
After an unsuccessful sand cleanout, you decide to run a tapered string.
How should the surface PCE be reconfigured?
27 / 30
During a snubbing operation with a workstring in the well, you replaced the lower stripper element of a dual stripper.
How do you confirm integrity of the new lower stripper element?
28 / 30
During a snubbing operation, when is the workstring most likely to buckle?
29 / 30
When stripping 'ram to ram' into a high-pressure gas well, the operator fails to stop the workstring at the correct space out point.
The operator forces the tool joint into the closed lower stripper ram.
What is the correct action to take?
30 / 30
With a workstring in the well, the snubbing PCE is leaking from a connection between the stripper rams.
Which barriers should be closed to allow the leak to be safely repaired?