Contact information
Plot 97 Odani Road, Elelenwo Port Harcourt, Nigeria
Call: +2348036712948
fred.ebhota@rikline.net; info@rikline.net
Wireline Exam
Fill in your information
1 / 30
The BOPs are closed with wireline in the well to allow the repair of leaking PCE above. The repairs are successful, and the wireline has been pulled back to surface. The well has been shut in and the PCE is depressurised. What action is required before continuing?
2 / 30
During a slickline operation in a gas production well, the toolstring has become stuck and a cutter bar is dropped. After dropping the cutter bar, the wireline is free but there is an unexpected increase in 'A' annulus pressure.
What could be the reason?
3 / 30
An operator is unable to achieve a successful low-pressure test on a wireline PCE rig up. What is the correct action to take?
4 / 30
When running slickline into a dry gas well, what should you do to reduce the wear of the stuffing box packings?
5 / 30
The tools are deep in the well during a wireline operation. You identify a slow leak in the tubing retrievable surface controlled subsurface safety valve (TRSCSSSV) control line. It is confirmed that the leak is below the tubing hanger. What action should you take?
6 / 30
During a PCE pressure test, an external leak develops at the wireline BOP stem. After bleeding off the pressure, what action should you take?
7 / 30
The wireline operator has informed you that a slickline BOP has been accidentally closed on the toolstring. Which action is required?
8 / 30
Why would a temporary gate valve be fitted above the Xmas Tree as part of the PCE during a wireline intervention operation?
9 / 30
Figure WL0-0007 shows a wireline PCE rig up. Figure WL0-0007
With wireline tools in the well, you replace a leaking seal above the BOP. How should the repaired seal be pressure tested?
10 / 30
During a slickline operation, the toolstring becomes stuck deep in the well. You are unable to move it. You close the slickline B0Ps. The lower set are leaking but the upper set are holding pressure. What should you do?
11 / 30
Figure WL0-0004 shows wireline PCE rigged up on a Xmas Tree.
Figure WL0-0004
During a wireline operation, the gauge manifold begins to leak at the pressure gauge. The operator stops the operation, closes the BOPs and makes the well safe.
After making repairs, it is not possible to pressurise the PCE above the upper set of BOPs as the equalising valve will not open. What action is required?
12 / 30
With slickline in the well, there is a leak in the PCE above the BOPs.
You close the BOPs but the leak continues.
You close the wire-cutting upper master gate valve and the leak stops.
What should you do next?
13 / 30
During a slickline intervention, there is a leak from a lubricator connection above the BOPs. After stopping the winch, what should you do next?
14 / 30
While pulling the wireline retrievable surface controlled subsurface safety valve (WRSCSSSV), it becomes stuck across the Xmas Tree.
The wireline BOPs have been fully closed but they are leaking. How can you control the well to allow the SCSSSV to be retrieved?
15 / 30
An urgent repair is required on the stuffing box as you are unable to stop a leak.
The tools are deep in the well.
The wireline operator closes the BOPs but they fail to seal. What actions are required to make the well safe?
16 / 30
With tools deep in the well, there is a leak in the slickline PCE above the BOPs. Once the BOPs are closed, both sets fail to seal. The leak is getting worse. What action should you take?
17 / 30
A cutter bar has been pulled back into the PCE after successfully cutting slickline above a stuck toolstring.
The well has been shut in at the Xmas Tree and pressure has been bled off from the PCE.
Which of the following must be considered when lifting the lubricator?
18 / 30
During a braided line intervention, two sets of B0Ps will be installed. How should the BOP rams be configured from top to bottom?
19 / 30
When starting to pull out of the well with a production logging tool (PLT), the weight indicator immediately shows a fluctuating weight increase.
20 / 30
You prepare to rig up slickline on a live gas well to pull a plug installed in the tubing hanger.
What important factor must you consider when planning the PCE rig up?
21 / 30
You arrive at the wellsite and the wireline is deep in the well. When inspecting the PCE, you notice that one of the components has a pressure rating that is slightly lower than the shut-in well head pressure. What is the first action to take?
22 / 30
A dual BOP is configured with the upper ram in the normal position and the lower ram inverted. The wireline operator closes the BOP on the wireline, injects grease and tests the BOP rams.
What level of barrier protection does this provide?
23 / 30
During a slickline operation, a leak develops at the stuffing box. The operation is stopped. The slickline operator tries to stop the leak but the leak is getting worse.
What actions should be taken?
24 / 30
Wireline tools are below the surface controlled subsurface safety valve (SCSSSV) when the control line begins to leak at the pump. What might happen?
25 / 30
Figure WL0-0005 shows a slickline PCE rig up with details of the B0Ps.
Figure WL0-0005
During a slickline operation, you see hydrocarbons leaking from the upper BOP equalising valve.
What is the first action should you take?
26 / 30
While trying to pull a wireline retrievable surface controlled subsurface safety valve (WRSCSSSV), the slickline breaks at surface. After leaking for a few seconds, the stuffing box has sealed.
What is the first action to take?
27 / 30
What is the purpose of using a BOP test rod when testing braided line and e-line BOPs?
28 / 30
The slickline operator reports that there is some damage to the BOP blind seals, and there are no spare seals available.
The BOP has passed a pressure test.
What should you do?
29 / 30
Figure WL0-0012 shows a cutter bar installed onto a slickline and ready to be dropped.
Figure WL0 -0012
During a slickline operation, you have lost jar action and the toolstring is stuck.
You have installed a cutter bar onto the wire and reattached the lubricator.
What sequence would you follow to drop the cutter bar?
30 / 30
While pulling out of the well, the winch operator notices that a strand is missing from the braided line and sees high weight indicator readings.
The operation is stopped.
What are the correct actions to take?
Your score is